# Scope of 1.0.0-beta-3

**URL:** <https://forum.operaton.org/t/scope-of-1-0-0-beta-3/172>\
**Category:** Development\
**Created:** [January 2, 2025, 2:57pm UTC](https://forum.operaton.org/t/scope-of-1-0-0-beta-3/172 "2025-01-02T14:57:45Z")\
**Posts on this page:** 4\
**Page:** 1

<div class="post-metadata">

**Author:** ![kthoms](https://forum.operaton.org/user_avatar/forum.operaton.org/kthoms/32/33_2.png) [@kthoms](https://forum.operaton.org/u/kthoms)\
**Post date:** [January 2, 2025, 2:57pm UTC](https://forum.operaton.org/t/scope-of-1-0-0-beta-3/172/1 "2025-01-02T14:57:45Z")

</div>

It has been already a month since 1.0.0-beta-2 has been released. A lot happened in the meantime. IMO we should think about to release 1.0.0-beta-3 in the not too far future.

Depending on the scope we can think about a time frame to schedule the release.

What do we have?

- “Operaton” (“Run”) distribution is build by default nightly
- Tons of code cleanups
- \>4k resolved Sonar findings
- JUnit 5 migration: Huge progress, but still the largest modules (esp. “engine”) to be done
- [Enable the bpmn.io badge in the bpmn-js and dmn-js renderers](https://github.com/operaton/operaton/commit/469f304be434e16ab7cfb90412c8f73cf0486531)
- Resolve some usages of deprecated code

There are some important tasks in the pipeline, which we may want to finish before releasing the next beta, or after. Here I **need your opinion** :

- Drop of Wildfly26/Tomcat 9 support
- Related to the above: Drop of Spring 5, Javax; Merge “Jakarta” modules into their “main” module
- Alpha version of webapps: Wait or integrate into distro? (Here I think it is too early for)
- Making Docker images available for the distros
- Documentation  
Anything else?

My feeling is that a good time for the next beta release is in 2 or 3 weeks (Jan 17th/24th).

What do you think?

---

<div class="post-metadata">

**Author:** ![Julian](https://forum.operaton.org/user_avatar/forum.operaton.org/julian/32/30_2.png) [@Julian](https://forum.operaton.org/u/Julian)\
**Post date:** [January 2, 2025, 3:35pm UTC](https://forum.operaton.org/t/scope-of-1-0-0-beta-3/172/2 "2025-01-02T15:35:38Z")

</div>

Thanks for bringing this up. I think for the new webapps it’s too early. Providing the docker images/ run distro should be in the scope of beta3.

I think finishing all refactoring should be not a blocker for beta3.

---

<div class="post-metadata">

**Author:** ![kthoms](https://forum.operaton.org/user_avatar/forum.operaton.org/kthoms/32/33_2.png) [@kthoms](https://forum.operaton.org/u/kthoms)\
**Post date:** [January 5, 2025, 12:31pm UTC](https://forum.operaton.org/t/scope-of-1-0-0-beta-3/172/3 "2025-01-05T12:31:51Z")

</div>

Agreed. Minor refactorings do not have to be complete.  
Docker images will be available soon.

I’m especially curious about the breaking changes, if we could finish them before.

---

<div class="post-metadata">

**Author:** ![paul](https://forum.operaton.org/user_avatar/forum.operaton.org/paul/32/26_2.png) [@paul](https://forum.operaton.org/u/paul)\
**Post date:** [January 7, 2025, 3:36pm UTC](https://forum.operaton.org/t/scope-of-1-0-0-beta-3/172/4 "2025-01-07T15:36:10Z")

</div>

Yes, web apps are too early ^^
